Specializing in Transportation Engineering Dams, Reservoirs and Surface Water Impoundments Municipal Engineering Denmon Engineering Civil Engineers and Surveyors Offices in Louisiana and Texas

Denmon Home
Contact Denmon
Denmon Staff
Professional Services
Links
Latest News and Announcements

 

 

 

Corner

HIGHWAY DESIGN EXPERIENCE

Denmon Engineering has acquired considerable experience in the design of streets, road and highway projects. Clients include a number of state and federal agencies, particularly the Department of Transportation and Development.

Interstate 49 -  Denmon Engineering was responsible for preparation of final plans of an urban interstate project consisting of roadway and bridge. Interstate 20 Access Road

Representative examples of the roadway projects accomplished by DE are listed below:

S.P. No. 455-05-0026 for LaDOTD
Alexandria Urban Section 20, Route I-49 Rapides Parish, Louisiana

Responsible for preparation of final plans of an urban interstate project consisting of roadway and bridge.


S.P. No. 700-30-0243 for LaDOTD

US 165 Olla-LA 843 LaSalle and Caldwell Parishes

Responsible for preliminary and final plans for reconstruction of existing 2-lane urban and rural section to a 5-lane urban section and a 4-lane divided rural section of US 165.


S.P. No. 700-18-87 for LaDOTD

Route US 71 US 84 to LA 7 Red River Parish, Louisiana

Responsible for preparation of preliminary and final plans including right-of-way maps of 5-lane urban section and 4-lane divided rural section of roadway and 5-lane bridge.


S.P. No. 700-19-42 for LaDOTD

Route LA 616-Union Parish Line Ouachita Parish

Responsible for preliminary and final plans for reconstruction of existing 2-lane rural section of LA 15.


S.P. No. 700-17-97 for LaDOTD

Gilbert-Chase Highway LA 15 Franklin Parish, Louisiana

Responsible for preliminary and final plans for the reconstruction of existing 2-lane section to a 4-lane divided rural and urban section.


S.P. No. 700-17-77 for LaDOTD

Widening of Airline Dr. (Bossier City) Route LA 3103 Bossier Parish, Louisiana

Responsible for revising preliminary plans and preparing final plans for widening of existing 2-lane urban section to 4-lane with subsurface drainage, right-of-way survey and maps.


S.P. No. 700-30-0020 & 700-30-0021 for LaDOTD

Greenville-Sicily Island LA 15 Catahoula Parish, Louisiana

Responsible for preparation of preliminary and final plans for reconstruction of existing 2-lane roadway to 4-lane divided rural section and 5-lane urban section, right-of-way surveys and maps.


S.P. No. 809-10-01 for LaDOTD


Martin Luther King Highway Shreveport, Louisiana
Responsible for preparation of right-of-way maps for the reconstruction of the Martin Luther King Highway.


S.P. No. 831-16-0004 for LaDOTD

Widening of Coleman Avenue LA Route 148 Lincoln Parish, Louisiana

Responsible for preparation of preliminary and final plans for widening of existing 2-lane urban sections to 4-lane with subsurface drainage, right-of-way surveys and maps.


S.P. No. 742-06-0015 for City of Monroe

Improvements to Kansas Lane (Millhaven to Central Avenue) Monroe, Louisiana

Project entailed reconstruction of 2-lane arterial street to a 5-lane urban section with turn lanes and subsurface drainage. Responsible for complete surveys, right-of-way maps, and preliminary and final plans preparation for total reconstruction of Kansas Lane in the City of Monroe.


S.P. No. 742-06-0016 for City of Monroe

Improvements to Kansas Lane (Central Avenue to Highway 80) Monroe, Louisiana

Project entailed reconstruction of 2-lane arterial street to a 5-lane urban section with turn lanes and subsurface drainage. Responsible for complete surveys, right-of-way maps, and preliminary and final plans preparation for total reconstruction of Kansas Lane in the City of Monroe.

© Copyright Denmon Engineering. All rights reserved. Website designed by ::LJg Consulting.
SITE MAP Home Contact Staff Services Links News